Friday, February 20, 2009
Getting back to work
Well it been a while scene I worked on the boat but the weather has not been right. I have a lot of epoxy to do and the weather needs to be right so it will cure right. Today I going to epoxy the deck bracing and start getting the chime logs ready to install. After I get them installed we well make sure every thing is in line and then start the plywood. After modifying the stem the boat will be 31 and 1/2 feet long and 9 feet 4 inches wide. Anyway that's about all that is been going on with the boat. well post later Y'all have a great day and may God bless you.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment